Case study – Biomass depot – Liverpool docks

Case study – Biomass depot – Liverpool docks

E.ON Energy’s biomass depot at the Liverpool docks transfers and delivers biomass from around the world. Fireworks engineered a watermist fire suppression solution for the depot’s three main biomass conveyers, totalling over 700m in length. Fireworks bespoke watermist...
Fireworks’ car fleet is electrifying

Fireworks’ car fleet is electrifying

Fireworks’ roadmap to reduce its carbon footprint includes moving our fleet to electric or hybrid vehicles by 2030. Fireworks electric car charging points Our third hybrid vehicle joined the fleet in November 2021 and we have installed two EV charging points at our...